logo

SAEMS Kalupahana Oya SHPP

Sector: Wind • Location: Sri Lanka

Source: World Bank Group

Project
Active

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 2.5MW Kalupahana Oya small hydropower plant, in Haldamulla City, Badulla District, Uva Province. The project used two Francis Turbines horizontal shaft, and was expected to generate 9.1GWh annually. The project company was Hynford Water Power Ltd. The project fe

Status
Prospective
Sector
Wind, Hydro, Power Generation (CCGT), Water Supply and Storage, Commercial, Government
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SAEMS Kalupahana Oya SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SAEMS Kalupahana Oya SHPP” is an infrastructure initiative in the Wind sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 2.5MW Kalupahana Oya small hydropower plant, in Haldamulla City, Badulla District, Uva Province. The project used two Francis Turbines horizontal shaft, and was expected to generate 9.1GWh annually. The project company was Hynford Water Power Ltd. The project fed of the Kalu Pahana Oya River. Output was to be supplied to the national grid (Ceylon Electricity Board). Expected project life was 22 years. Expected tariff was Rs 6.93/kWh. The PPA was signed in June 2008. The EPC contract signed in July 2008. Construction started in July 2008. The project commissioned in October 2011. Total cost was expected to be US$3.8 million. The investment decision was made in October 2006. Financial closure was reported at September 2008 (CDM documentation). The debt/equity ratio was expected to be 65/35. IRR was 13.18 without CDM and 16.11 with CDM (expected). The coordinates of the project are: Latitude 6° 43’51.93” N / Longitude 80° 51’10.35” E https://cdm.unfccc.int/filestorage/5/p/QZ8VI1HKCEW3OJP90L4RMFDAB5NUXS.pdf/PDD%20Ver%204.1%20-%2008%20Nov%2012.pdf?t=ZnJ8bWV4Zjk2fDBgx07wZPIpWPxTDtMvgQrM

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Hydro, Power Generation (CCGT), Water Supply and Storage, Commercial, Government

Article published date

2024-06-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project