SAEMS Wewelwatta 1 & 2 SHPPs

Sector: Hydro • Location: Sri Lanka

Source: World Bank Group

Project
Active

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.8MW and 3.2MW Wewelwatta 1 & 2 small hydropower plants, in Wewelwatta City, Ratnapura District, Sabaragamuwa Province. The project used two Pelton Turbines vertical shaft (Plant 1) and two Francis turbines horizontal shaft (plant 2), and was expected to genera

Project Information FAQ

Project Information

4 Q
The project “SAEMS Wewelwatta 1 & 2 SHPPs” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.8MW and 3.2MW Wewelwatta 1 & 2 small hydropower plants, in Wewelwatta City, Ratnapura District, Sabaragamuwa Province. The project used two Pelton Turbines vertical shaft (Plant 1) and two Francis turbines horizontal shaft (plant 2), and was expected to generate 13.7GWh and 9.3GWh annually. The project company was Upcountry Power Supply International Ltd. The project fed of the Bambarabotuwa River. Output was to be supplied to the national grid (Ceylon Electricity Board). Expected project life was 22 years. Expected tariff was Rs 5.75/kWh. The PPA was signed in March 2008. The EPC contract signed in November 2007 (plant 1) and July 2008 (plant 2). Construction started in November 2007 (plant 1) and March 2012 (plant 2). The project commissioned in July 2012 (plant 1) and May 2013 (plant 2). Total cost was expected to be US$6.79 million and US$4.53 million, total US$11.3 million. The investment decision was made in October 2006. Financial closure was reported at September 2008 (25% rule). The debt/equity ratio was expected to be 65/35. IRR was 13.19% without CDM and 16.16% with CDM (expected). The coordinates of the project are: Latitude 6° 40’59.88” N / Longitude 80° 35’00.00” E (plant 1) Latitude 6° 39’59.76” N / Longitude 80° 34’59.88” E (plant 2) https://cdm.unfccc.int/filestorage/5/p/QZ8VI1HKCEW3OJP90L4RMFDAB5NUXS.pdf/PDD%20Ver%204.1%20-%2008%20Nov%2012.pdf?t=ZnJ8bWV4Zjk2fDBgx07wZPIpWPxTDtMvgQrM

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data