SAEMS Wewelwatta 1 & 2 SHPPs
One of 10,000+ projects Taiyo tracks in Sri Lanka.
Source: World Bank Group
South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.8MW and 3.2MW Wewelwatta 1 & 2 small hydropower plants, in Wewelwatta City, Ratnapura District, Sabaragamuwa Province. The project used two Pelton Turbines vertical shaft (Plant 1) and two Francis turbines horizontal shaft (plant 2), and was expected to genera
- Status
- Prospective
- Sector
- Hydro, Wind, Power Generation (CCGT), Government, Commercial
- Location
- Sri Lanka
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SAEMS Wewelwatta 1 & 2 SHPPs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.8MW and 3.2MW Wewelwatta 1 & 2 small hydropower plants, in Wewelwatta City, Ratnapura District, Sabaragamuwa Province. The project used two Pelton Turbines vertical shaft (Plant 1) and two Francis turbines horizontal shaft (plant 2), and was expected to generate 13.7GWh and 9.3GWh annually. The project company was Upcountry Power Supply International Ltd. The project fed of the Bambarabotuwa River. Output was to be supplied to the national grid (Ceylon Electricity Board). Expected project life was 22 years. Expected tariff was Rs 5.75/kWh. The PPA was signed in March 2008. The EPC contract signed in November 2007 (plant 1) and July 2008 (plant 2). Construction started in November 2007 (plant 1) and March 2012 (plant 2). The project commissioned in July 2012 (plant 1) and May 2013 (plant 2). Total cost was expected to be US$6.79 million and US$4.53 million, total US$11.3 million. The investment decision was made in October 2006. Financial closure was reported at September 2008 (25% rule). The debt/equity ratio was expected to be 65/35. IRR was 13.19% without CDM and 16.16% with CDM (expected). The coordinates of the project are: Latitude 6° 40’59.88” N / Longitude 80° 35’00.00” E (plant 1) Latitude 6° 39’59.76” N / Longitude 80° 34’59.88” E (plant 2) https://cdm.unfccc.int/filestorage/5/p/QZ8VI1HKCEW3OJP90L4RMFDAB5NUXS.pdf/PDD%20Ver%204.1%20-%2008%20Nov%2012.pdf?t=ZnJ8bWV4Zjk2fDBgx07wZPIpWPxTDtMvgQrM |
Original sector | Energy |
Budget |
Location
Country | Sri Lanka |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Hydro, Wind, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
