logo

SAEMS Wewelwatta 1 & 2 SHPPs

One of 10,000+ projects Taiyo tracks in Sri Lanka.

Source: World Bank Group

Project
Active

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.8MW and 3.2MW Wewelwatta 1 & 2 small hydropower plants, in Wewelwatta City, Ratnapura District, Sabaragamuwa Province. The project used two Pelton Turbines vertical shaft (Plant 1) and two Francis turbines horizontal shaft (plant 2), and was expected to genera

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Commercial
Location
Sri Lanka
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SAEMS Wewelwatta 1 & 2 SHPPs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SAEMS Wewelwatta 1 & 2 SHPPs” is an infrastructure initiative in the Hydro sector, located in Sri Lanka. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

South Asia Energy Management Systems, from California (USA) - and registered in the Netherlands as SAEMS Capital B.V., was developing the 4.8MW and 3.2MW Wewelwatta 1 & 2 small hydropower plants, in Wewelwatta City, Ratnapura District, Sabaragamuwa Province. The project used two Pelton Turbines vertical shaft (Plant 1) and two Francis turbines horizontal shaft (plant 2), and was expected to generate 13.7GWh and 9.3GWh annually. The project company was Upcountry Power Supply International Ltd. The project fed of the Bambarabotuwa River. Output was to be supplied to the national grid (Ceylon Electricity Board). Expected project life was 22 years. Expected tariff was Rs 5.75/kWh. The PPA was signed in March 2008. The EPC contract signed in November 2007 (plant 1) and July 2008 (plant 2). Construction started in November 2007 (plant 1) and March 2012 (plant 2). The project commissioned in July 2012 (plant 1) and May 2013 (plant 2). Total cost was expected to be US$6.79 million and US$4.53 million, total US$11.3 million. The investment decision was made in October 2006. Financial closure was reported at September 2008 (25% rule). The debt/equity ratio was expected to be 65/35. IRR was 13.19% without CDM and 16.16% with CDM (expected). The coordinates of the project are: Latitude 6° 40’59.88” N / Longitude 80° 35’00.00” E (plant 1) Latitude 6° 39’59.76” N / Longitude 80° 34’59.88” E (plant 2) https://cdm.unfccc.int/filestorage/5/p/QZ8VI1HKCEW3OJP90L4RMFDAB5NUXS.pdf/PDD%20Ver%204.1%20-%2008%20Nov%2012.pdf?t=ZnJ8bWV4Zjk2fDBgx07wZPIpWPxTDtMvgQrM

Original sector

Energy

Budget

Location

Country

Sri Lanka

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project