Safaga port

Sector: Water Supply and Storage • Location: Egypt, Arab Republic of

Source: International Finance Corporation (IFC)

Project
Pending

The proposed project comprises the design, construction and operation of a new 776,000m2 multipurpose terminal with quay wall length of 1,100m2 in Safaga, Egypt (the “Project”). The Project will serve the national market and offering a diversified set of services, including dry bulk, container cargo (not currently offered at Safaga’s existing port) and Roll-on Roll-off (RoRo).Safaga bay is located

Project Information FAQ

Project Information

4 Q
The project “Safaga port” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pending

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project comprises the design, construction and operation of a new 776,000m2 multipurpose terminal with quay wall length of 1,100m2 in Safaga, Egypt (the “Project”). The Project will serve the national market and offering a diversified set of services, including dry bulk, container cargo (not currently offered at Safaga’s existing port) and Roll-on Roll-off (RoRo).Safaga bay is located in the Red Sea Governorate on the western coast of the Red Sea, 60km south of Hurghada and 435km south of the Suez port. The project will be implemented by a special purpose vehicle (“SPV”) named Safaga Terminal Operating Company S.A.E. (STOC or “the Company”). The company is under incorporation and owned by Abu Dhabi Ports Group (ADPG or the Sponsor). A 30-year concession agreement was signed in March 2023 with the General Authority for Red Sea Ports (RSPA) under the Ministry of Transport MoT. The project costs c.US$208.9mm including US$ 175.8mm for the port’s superstructure (cranes, IT equipment and civil works), US$ 15mm for the advanced payment for the concession fees, US$ 9.7mm for contingencies and other cost and US$ 8.4mm for the financing expenses. The sources of financing will be from a combination of equity in the form of share capital and shareholder loans (45%) and senior debt (55%), including up to US$ 50mm Senior A loan from IFC, up to US$ 11mm from the MCPP fund and with the remaining balance to be mobilized through Parallel Loans.Phase 1 of the project has been completed by RSPA who was responsible for the marine works consisting of land reclamation, quay construction (1000m length and -17.5m depth), dredging works immediately infront of the quay wall, dredging of an offshore approach channel at a depth of -19m and associated dredge dump area, installation of utilities including fresh water, waste water/sewage, wired telecommunications and electricity (11KV) transformer, waste water treatment plant (250m3/day), desalination plant (500m3/day). All of the works completed by RSPA mentioned above are considered associated facilities in accordance with IFC Performance Standards (PSs).The sponsor is responsible for Phase 2 of the project which involves the construction of the superstructure including the Container terminal (283,000m³) comprising container stacks and reefers (500,000 TEUs), container freight station, inspection areas, buildings, roads, gate complexes, substations and all other associated infrastructure required to support the container terminal with hybrid diesel, RTGs, reach stackers; Roll-on/ Roll-off units (44,000m² for 51,500 units); Dry bulk, break bulk storage and general cargo (196,000m² for 1.6mil metric tons); Warehouse; Future Liquid cargo (67,000m² for 1mil metric tons of storage capacity); Container repair area; Road network connected with existing roads; Concrete apron (48,000m²); Other utilities inter alia – firefighting; and ISPS fencing. Other components of the greater development of the area that are not considered associated facilities, as they do not meet all IFC PS1 criteria include the re-location of existing Logistics Hub (a staging area with amenities); re-location of external roadworks; quarry (approx. 1.5km SW of the new terminal); future railway connection; and the re-location of the Safaga Fishing Port.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data