Safeway Refrigerated Warehouse
Sector: Cement • Location: Canada
Source: Bird Construction
The Safeway Refrigerated Warehouse project is a 10,600 square metre addition to a refrigerated distribution warehouse and renovations to an existing 36,000 square metre building. The new build includes exterior reinforced concrete dock slabs, a new refrigeration system and 16 new overhead loading bay doors. The upgraded refrigeration system includes 30 compressors and evaporators throughout the fa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Safeway Refrigerated Warehouse project is a 10,600 square metre addition to a refrigerated distribution warehouse and renovations to an existing 36,000 square metre building. The new build includes exterior reinforced concrete dock slabs, a new refrigeration system and 16 new overhead loading bay doors. The upgraded refrigeration system includes 30 compressors and evaporators throughout the facility to control the temperature. To manage this complex refrigeration arrangement, Bird supplied and installed a state-of-the-art automated control system. During construction, the team was faced with a design change to the floor slab when a newly developed joint-free, high-performance refrigeration slab was introduced. Highly adaptable, the Bird team accommodated the design change, allowing an 80% reduction in expansion joints. This dramatic reduction will reduce the demand on maintenance, thereby allowing the client to increase production. Challenged by working on an operational site, the team adhered to strict food safety standards as two full-time Canadian Food Inspection Agents were on-site at all times. Bird ensured clean production areas by using temporary stud wall hoarding units to prevent the infiltration of construction material. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
