logo
ProjectUnknown

Safeway Refrigerated Warehouse

The status, timeline and source of this project. A free account opens every field.

Source: Bird Construction

The Safeway Refrigerated Warehouse project is a 10,600 square metre addition to a refrigerated distribution warehouse and renovations to an existing 36,000 square metre building. The new build includes exterior reinforced concrete dock slabs, a new refrigeration system and 16 new overhead loading bay doors. The upgraded refrigeration system includes 30 compressors and evaporators throughout the fa

Status
Unknown
Sector
Cement, Commercial, Steel, Warehouse, Manufacturing (Industrial)
Location
Canada
Updated
22 Jul 2026
Source
Bird Construction

ConstructChat

Ask ConstructChat about Safeway Refrigerated Warehouse

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Safeway Refrigerated Warehouse” is an infrastructure initiative in the Cement sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Participants

Company

Status

Original status

unknown

Taiyo status

Unknown

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Safeway Refrigerated Warehouse project is a 10,600 square metre addition to a refrigerated distribution warehouse and renovations to an existing 36,000 square metre building. The new build includes exterior reinforced concrete dock slabs, a new refrigeration system and 16 new overhead loading bay doors. The upgraded refrigeration system includes 30 compressors and evaporators throughout the facility to control the temperature. To manage this complex refrigeration arrangement, Bird supplied and installed a state-of-the-art automated control system. During construction, the team was faced with a design change to the floor slab when a newly developed joint-free, high-performance refrigeration slab was introduced. Highly adaptable, the Bird team accommodated the design change, allowing an 80% reduction in expansion joints. This dramatic reduction will reduce the demand on maintenance, thereby allowing the client to increase production. Challenged by working on an operational site, the team adhered to strict food safety standards as two full-time Canadian Food Inspection Agents were on-site at all times. Bird ensured clean production areas by using temporary stud wall hoarding units to prevent the infiltration of construction material.

Location

Country

Canada

Source

Source reliability

High

Source

Bird Construction

URL

More Details

Record type

Project

Sector

Cement, Commercial, Steel, Warehouse, Manufacturing (Industrial)

Article published date

2023-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project