logo

Safeway Refrigerated Warehouse

Sector: Cement • Location: Canada

Source: Bird Construction

Project
Unknown

The Safeway Refrigerated Warehouse project is a 10,600 square metre addition to a refrigerated distribution warehouse and renovations to an existing 36,000 square metre building. The new build includes exterior reinforced concrete dock slabs, a new refrigeration system and 16 new overhead loading bay doors. The upgraded refrigeration system includes 30 compressors and evaporators throughout the fa

Project Information FAQ

Project Information

3 Q
The project “Safeway Refrigerated Warehouse” is an infrastructure initiative in the Cement sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Safeway Refrigerated Warehouse project is a 10,600 square metre addition to a refrigerated distribution warehouse and renovations to an existing 36,000 square metre building. The new build includes exterior reinforced concrete dock slabs, a new refrigeration system and 16 new overhead loading bay doors. The upgraded refrigeration system includes 30 compressors and evaporators throughout the facility to control the temperature. To manage this complex refrigeration arrangement, Bird supplied and installed a state-of-the-art automated control system. During construction, the team was faced with a design change to the floor slab when a newly developed joint-free, high-performance refrigeration slab was introduced. Highly adaptable, the Bird team accommodated the design change, allowing an 80% reduction in expansion joints. This dramatic reduction will reduce the demand on maintenance, thereby allowing the client to increase production. Challenged by working on an operational site, the team adhered to strict food safety standards as two full-time Canadian Food Inspection Agents were on-site at all times. Bird ensured clean production areas by using temporary stud wall hoarding units to prevent the infiltration of construction material.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data