logo
ProjectPlanned

Sagamore Bridge Replacement Project

The owner, status and timeline of this project. A free account opens every field.

Source: Vermont Public

The project involves the replacement of the Sagamore Bridge on Cape Cod with two separate spans for northbound and southbound traffic. The new bridge will allow traffic to be moved onto one span while the other is still under construction, enabling earlier use of the new bridge. Construction is scheduled to start in winter 2027-2028, with partial use of the new bridge expected by 2033. The project

Status
Prospective
Sector
Water Supply and Storage, Road, Bridge
Location
Falmouth, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Vermont Public

ConstructChat

Ask ConstructChat about Sagamore Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sagamore Bridge Replacement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Falmouth, Massachusetts, United States. Taiyo aggregates data on it from Vermont Public.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the replacement of the Sagamore Bridge on Cape Cod with two separate spans for northbound and southbound traffic. The new bridge will allow traffic to be moved onto one span while the other is still under construction, enabling earlier use of the new bridge. Construction is scheduled to start in winter 2027-2028, with partial use of the new bridge expected by 2033. The project aims to avoid cost overruns and delays by using independent cost estimates and close coordination with the Federal Highway Administration.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Falmouth

Source

Source

Vermont Public

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Bridge

Article published date

2026-04-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project