Saginaw CDF Incremental Dike Raising Phase II
Sector: Manufacturing (Industrial) • Location: Saginaw, Michigan, United States of America
Source: Dodge
The US Army Corps of Engineers (USACE) Detroit District is seeking contractors with the capability to provide construction services for Phase II of the incremental raising of the south perimeter dike at the Saginaw confined disposal facility (CDF). Tasks are expected to include: Mobilize to the site through the northeast platform of the CDF Clear and grub the brush and vegetation from the dike con
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Consumer Products, Commercial
- Location
- Saginaw, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Saginaw CDF Incremental Dike Raising Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The US Army Corps of Engineers (USACE) Detroit District is seeking contractors with the capability to provide construction services for Phase II of the incremental raising of the south perimeter dike at the Saginaw confined disposal facility (CDF). Tasks are expected to include: Mobilize to the site through the northeast platform of the CDF Clear and grub the brush and vegetation from the dike construction limits and all material borrow areas. Material from the CDF will be used to raise the d... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Saginaw |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Consumer Products, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
