logo
ProjectActive

Sainshand - Tsagaan suvarga TL project

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Provision of a sovereign loan to Mongolia in the amount of up to USD 30m (EUR 26.4m) (the “Loan”) to finance construction of the 214km Sainshand – Tsagaan suvarga high voltage transmission line and substation upgrade at Tsagaan suvarga (the “Project”) located in the south east of Mongolia. The Project is expected to be co-financed by international donors. The Project is expected to significantly s

Status
Prospective
Sector
Government, Commercial, Residential, Power Generation (CCGT), Power Transmission, Road
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Sainshand - Tsagaan suvarga TL project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sainshand - Tsagaan suvarga TL project” is an infrastructure initiative in the Government sector. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Provision of a sovereign loan to Mongolia in the amount of up to USD 30m (EUR 26.4m) (the “Loan”) to finance construction of the 214km Sainshand – Tsagaan suvarga high voltage transmission line and substation upgrade at Tsagaan suvarga (the “Project”) located in the south east of Mongolia. The Project is expected to be co-financed by international donors. The Project is expected to significantly strengthen the Mongolian grid network by interconnecting the southern grid network with the rest of the central energy system. This will ensure reliable and stable supply of the energy to the end users, decrease transmission losses and increased absorption capacity from variable renewable energy. The Project is expected to result in significant environmental benefits as it will reduce power transmission loss and improve energy efficiency which will reduce associated CO2 emissions. Complete bullet point list of documents in ESIA Disclosure Package (edit below as appropriate) In English: 1.1 Environmental and Social Impact Assessment (ESIA) Chs1-6 1.2 Environmental and Social Impact Assessment (ESIA) Chs7-18 1.3 Environmental and Social Impact Assessment (ESIA) Chs19-20 1.4 Environmental and Social Impact Assessment (ESIA) Appendices 2. Non-Technical Summary or Executive Summary (NTS) 3. Environmental and Social Action Plan (ESAP) 4. Environmental and Social Management Plan (ESMP) 5. Land Acquisition and Resettlement Framework (LARF) 6. Biodiversity management plan (BMP) 7. Stakeholder Engagement Plan (SEP) 7.1 Stakeholder Engagement Plan (SEP) Appendices In Mongolian: 1.1 Байгаль орчин, нийгмийн нөлөллийн үнэлгээ (БОННҮ) 1-6 бүлэг 1.2 Байгаль орчин, нийгмийн нөлөллийн үнэлгээ (БОННҮ) 7-18 бүлэг 1.3 Байгаль орчин, нийгмийн нөлөллийн үнэлгээ (БОННҮ) 19-20 бүлэг 1.4 Байгаль орчин, нийгмийн нөлөллийн үнэлгээ (БОННҮ) Хавсралт 1-хэсэг 1.5 Байгаль орчин, нийгмийн нөлөллийн үнэлгээ (БОННҮ) Хавсралт 2-хэсэг 2 Tехникийн бус хураангуй (ТБХ) 3 Байгаль орчин, нийгмийн үйл ажиллагааны төлөвлөгөө (БОНҮАТ) 4 Байгаль орчин, нийгмийн менежментийн төлөвлөгөө (БОНМТ) 5 Газар чөлөөлөлт, нүүлгэн суурьшуулах хамрах хүрээ (ГЧНСХХ) 6 Биологийн олон янз байлдлын менежментийн төлөвлөгөө (БОЯБМТ) 7 Талуудын оролцоог хангах төлөвлөгөө (ТОХТ) 7.1 Талуудын оролцоог хангах төлөвлөгөө (ТОХТ) Хавсралт Download zip package in English Download zip package in Mongolian Full ESIA documentation is available locally at: Ministry of Energy of Mongolia Government building XIV, Chingis avenue, Khoroo – 3, Khan-Uul district, 17060 UlaanbaatarMongolia Telephone: +976 51 263051 And EBRD Ulaanbaatar Resident Office, 3rd Floor, MCS Plaza, Seoul Street – 4A, 14251 Ulaanbaatar, Mongolia telephone: + 976 11 317 974 Environmental or social enquiries Contact person: Mr. Munkhtur E, Ministry of Energy of Mongolia Telephone: +976 99049030 Email: munkhtur@energy.gov.mn

Original sector

Municipal Infrastructure

Location

Not available for this record.

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Government, Commercial, Residential, Power Generation (CCGT), Power Transmission, Road

Article published date

2025-12-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project