Saint Cloud - Rummell Road Trail Improvements
Sector: Waste Processing and Treatment • Location: St. Cloud, Florida, United States of America
Source: Dodge
The project proposes to construct an 8-foot wide asphalt trail approximately 6,400 linear feet in length and a 5-foot wide concrete sidewalk approximately 1,125 linear feet in length in the right of way and within easements along Rummell Road in St. Cloud Florida. The project will include clearing and demolition of existing features, the relocation of various utilities, the installation of storm w
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Rail, Mass Transit, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government
- Location
- St. Cloud, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Saint Cloud - Rummell Road Trail Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project proposes to construct an 8-foot wide asphalt trail approximately 6,400 linear feet in length and a 5-foot wide concrete sidewalk approximately 1,125 linear feet in length in the right of way and within easements along Rummell Road in St. Cloud Florida. The project will include clearing and demolition of existing features, the relocation of various utilities, the installation of storm water piping and structures, concrete driveway and sidewalk construction, signage and striping for... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | St. Cloud |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Rail, Mass Transit, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
