Saint John - Retail Drive Reconfiguration
Sector: Mass Transit • Location: New Brunswick, Canada
Source: Infrastructure Canada
Retail Drive is a major corridor to East Point, a growing retail centre in Saint John. It comprises almost 500,000 sq.ft. of retail space with plans for significant additional commercial and residential development. Future buildout of the site is at risk due to the need for infrastructure upgrades. The project will see a reconstructed section of Retail Drive that includes sewer piping sized for th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Retail Drive is a major corridor to East Point, a growing retail centre in Saint John. It comprises almost 500,000 sq.ft. of retail space with plans for significant additional commercial and residential development. Future buildout of the site is at risk due to the need for infrastructure upgrades. The project will see a reconstructed section of Retail Drive that includes sewer piping sized for the continued buildout of East Point. The street will also be re-aligned with Ashburn Lake Road to improve traffic flow in the area. The work will see the storm sewer system upgraded within the project limits and the sanitary sewer capacity doubled within the project limits to accommodated the projected growth and to reduce the risk of sewer backups. Ancillary benefits include safety improvements for pedestrians and motorists, as well as increased level of service for this busy intersection. Pedestrian signals will be upgraded to include audible pedestrian signals, a countdown signal and accessible ramps. There is a busy rail crossing within a short distance of this intersection; this project will include the introduction of railway crossing gates, and traffic signal pre-emption which will allow the light to change to green in the event of an approaching train to ensure traffic is not backed up on the tracks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
