logo

Saint John - Retail Drive Reconfiguration

Sector: Mass Transit • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

Retail Drive is a major corridor to East Point, a growing retail centre in Saint John. It comprises almost 500,000 sq.ft. of retail space with plans for significant additional commercial and residential development. Future buildout of the site is at risk due to the need for infrastructure upgrades. The project will see a reconstructed section of Retail Drive that includes sewer piping sized for th

Project Information FAQ

Project Information

5 Q
The project “Saint John - Retail Drive Reconfiguration” is an infrastructure initiative in the Mass Transit sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Retail Drive is a major corridor to East Point, a growing retail centre in Saint John. It comprises almost 500,000 sq.ft. of retail space with plans for significant additional commercial and residential development. Future buildout of the site is at risk due to the need for infrastructure upgrades. The project will see a reconstructed section of Retail Drive that includes sewer piping sized for the continued buildout of East Point. The street will also be re-aligned with Ashburn Lake Road to improve traffic flow in the area. The work will see the storm sewer system upgraded within the project limits and the sanitary sewer capacity doubled within the project limits to accommodated the projected growth and to reduce the risk of sewer backups. Ancillary benefits include safety improvements for pedestrians and motorists, as well as increased level of service for this busy intersection. Pedestrian signals will be upgraded to include audible pedestrian signals, a countdown signal and accessible ramps. There is a busy rail crossing within a short distance of this intersection; this project will include the introduction of railway crossing gates, and traffic signal pre-emption which will allow the light to change to green in the event of an approaching train to ensure traffic is not backed up on the tracks.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data