logo
ProjectPlanned

Saint John Data Centre Project

Sector: Natural Gas • Location: Saint John, New Brunswick, Canada

Source: Yahoo News UK

Beacon AI Centers and VoltaGrid propose to build a data centre on a 120-hectare parcel of land in the Spruce Lake Industrial Park, Saint John. The project includes enclosed buildings to limit noise and control systems for heating, cooling, noise, and fire suppression. The data centre will require energy from the N.B. Power grid and an on-site 190 MW natural gas-fired power-generating system by Vol

Status
Prospective
Sector
Natural Gas, Manufacturing (Industrial), Data Center, Power Generation (CCGT)
Location
Saint John, New Brunswick, Canada
Updated
22 Jul 2026
Source
Yahoo News UK

ConstructChat

Ask ConstructChat about Saint John Data Centre Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Saint John Data Centre Project” is an infrastructure initiative in the Natural Gas sector, located in Saint John, New Brunswick, Canada. Taiyo aggregates data on it from Yahoo News UK.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Beacon AI Centers and VoltaGrid propose to build a data centre on a 120-hectare parcel of land in the Spruce Lake Industrial Park, Saint John. The project includes enclosed buildings to limit noise and control systems for heating, cooling, noise, and fire suppression. The data centre will require energy from the N.B. Power grid and an on-site 190 MW natural gas-fired power-generating system by VoltaGrid. The project is subject to public consultations and an environmental impact assessment before proceeding.

Original sector

Technology

Budget

Location

Country

Canada

State

New Brunswick

City

Saint John

Source

Source

Yahoo News UK

URL

More Details

Record type

Project

Sector

Natural Gas, Manufacturing (Industrial), Data Center, Power Generation (CCGT)

Article published date

2025-11-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project