Saint John Flood Mitigation Strategy Project
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
This project includes the new construction and rehabilitation of 27 assets including a sea wall, pumping stations, and power related infrastructure which provide wastewater, water, power, and other essential services. The three sub-projects, chosen because of their higher consequences of failure as a result of flooding events, are: (1) refurbishment of a Sea Wall, (2) raising or replacement critic
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Power Transmission, Government
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Saint John Flood Mitigation Strategy Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the new construction and rehabilitation of 27 assets including a sea wall, pumping stations, and power related infrastructure which provide wastewater, water, power, and other essential services. The three sub-projects, chosen because of their higher consequences of failure as a result of flooding events, are: (1) refurbishment of a Sea Wall, (2) raising or replacement critical municipal infrastructure (nine wastewater pumping stations and one water pumping station) above flood levels, and (3) relocation of Critical Waterfront Electrical Utility Infrastructure. Together, these projects will reduce impact of flooding and storm events and climate change on public infrastructure. |
Original sector | Climate Resilience |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
