SAINT LUKE CHURCH RD/COOCHEE CREEK RD @ WILLACOOCHEE RIVER
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Proposed project will replace the approximately 203-foot long bridge (number 019-5046-0) built in 1976 with a 230-foot long by 30.08-foot wide bridge and is located on CR 234/Saint Luke Church Road over Willacoochee River, 5.7 miles Northeast of the Town of Alapaha City in Berrien County. Rural Local road paved until approximately 220-ft south of the existing bridge with an existing 80-foot right
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction work program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Proposed project will replace the approximately 203-foot long bridge (number 019-5046-0) built in 1976 with a 230-foot long by 30.08-foot wide bridge and is located on CR 234/Saint Luke Church Road over Willacoochee River, 5.7 miles Northeast of the Town of Alapaha City in Berrien County. Rural Local road paved until approximately 220-ft south of the existing bridge with an existing 80-foot right of way corridor with two 10-foot wide paved travel lanes. A dirt road approximately 220-ft south of the existing bridge with an existing 40-foot right of way corridor with two 8-foot wide unpaved travel lanes. Replaces the existing bridge alignment with two 11-foot travel lanes and 4-foot (2-foot paved) shoulders in both directions with a proposed right of way to be 110-foot. Project limits begin 0.10 mile south of the bridge and ends 0.10 mile north of existing bridge, with an overall length of 0.24 mile. Off-site detour during construction with 2.1 miles less than the existing traffic route. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
