Saint Paul Harbor Fender Piling Replacement REBID
Sector: Forest Products and Packaging • Location: Kodiak, Alaska, United States of America
Source: Dodge USA
The purpose of the project is to replace piles to maintain and repair two adjacent docks in St Paul Harbor, Kodiak, Alaska. Specifically, the proposed project would: Remove 48 30.5-centimeter (12-inch) diameter timber piles and 25 32.4-centimeter (12.75-inch) diameter steel piles. Replace removed piles with 73 32.4-centimeter (12.75-inch) diameter galvanized steel piles, utilizing existing holes t
- Status
- Closed
- Sector
- Forest Products and Packaging, Power Transmission, Seaport, Steel, Government, Metal, Commercial, Power Generation (CCGT), Water Supply and Storage
- Location
- Kodiak, Alaska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Saint Paul Harbor Fender Piling Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to replace piles to maintain and repair two adjacent docks in St Paul Harbor, Kodiak, Alaska. Specifically, the proposed project would: Remove 48 30.5-centimeter (12-inch) diameter timber piles and 25 32.4-centimeter (12.75-inch) diameter steel piles. Replace removed piles with 73 32.4-centimeter (12.75-inch) diameter galvanized steel piles, utilizing existing holes to the maximum extent practicable. Conduct pile removal and installation from a local floating con... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alaska |
City | Kodiak |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Power Transmission, Seaport, Steel, Government, Metal, Commercial, Power Generation (CCGT), Water Supply and Storage |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- CS 572/OAK STREET FROM REYNOLDS STREET TO BURNS STREET - TIA
- CR 29/OLD WEST POINT ROAD @ CHATTAHOOCHEE RIVER TRIB
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202613
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202614
- GLENWOOD-LUMBER CITY ROAD
- CALHOUN STREET FROM JONES STREET TO S OF JONES STREET - TIA
- JOHNSON STREET IN LUMBER CITY - TIA
- HELEN STREET IN LUMBER CITY
