logo

Saiss III water conservation project

Sector: Hydro • Location: Morocco

Source: European Bank for Reconstruction and Development (EBRD)

Project
Signed

Provision of a sovereign loan of up to EUR 150 million to the Kingdom of Morocco to finance the construction of the continuity of main pipeline as well as the water distribution network aimed at irrigating 20,000 hectares in the Saiss plain (the "Saiss III" or the "Project"). The Project is the third and final phase of a staged programme to preserve the Saiss aquifer and promote sustainable water

Project Information FAQ

Project Information

5 Q
The project “Saiss III water conservation project” is an infrastructure initiative in the Hydro sector, located in Morocco. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

signed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Provision of a sovereign loan of up to EUR 150 million to the Kingdom of Morocco to finance the construction of the continuity of main pipeline as well as the water distribution network aimed at irrigating 20,000 hectares in the Saiss plain (the "Saiss III" or the "Project"). The Project is the third and final phase of a staged programme to preserve the Saiss aquifer and promote sustainable water management within the Saiss plain which envisages an annual transfer of 90-120 million m3 surface water from the MDez dam to the plain for irrigation purposes. As part of this programme, the Bank previously extended in 2017 a sovereign loan of EUR 120 million to finance a 45 km of the main transfer pipeline (The ''Saiss I''), OPID 48414. In 2020, the Bank extended a second sovereign loan of EUR 150 million, to finance the main distribution pipeline and network for irrigation of 10,000ha (The ''Saiss II''), OPID 51223.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data