Sakaka Photovoltaic Solar Project
Sector: Power Generation (CCGT) • Location: Sakaka, Al Jouf, Saudi Arabia
Source: Mercomindia.com
The Sakaka Photovoltaic Solar Project in Sakaka City, Al Jouf Province, Saudi Arabia, was launched in April 2021. It has a capacity of 300 MW and is the first utility-scale renewable energy project under the Custodian of the Two Holy Mosques Renewable Energy Initiative.
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Solar
- Location
- Sakaka, Al Jouf, Saudi Arabia
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Sakaka Photovoltaic Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sakaka Photovoltaic Solar Project in Sakaka City, Al Jouf Province, Saudi Arabia, was launched in April 2021. It has a capacity of 300 MW and is the first utility-scale renewable energy project under the Custodian of the Two Holy Mosques Renewable Energy Initiative. |
Original sector | Energy |
Budget |
Location
Country | Saudi Arabia |
State | Al Jouf |
City | Sakaka |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Solar |
Article published date | 2025-04-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
