logo

Sakaka Photovoltaic Solar Project

Sector: Power Generation (CCGT) • Location: Sakaka, Al Jouf, Saudi Arabia

Source: Mercomindia.com

Project
Completed

The Sakaka Photovoltaic Solar Project in Sakaka City, Al Jouf Province, Saudi Arabia, was launched in April 2021. It has a capacity of 300 MW and is the first utility-scale renewable energy project under the Custodian of the Two Holy Mosques Renewable Energy Initiative.

Status
Closed
Sector
Power Generation (CCGT), Power Transmission, Solar
Location
Sakaka, Al Jouf, Saudi Arabia
Updated
22 Jul 2026
Source
Mercomindia.com

ConstructChat

Ask ConstructChat about Sakaka Photovoltaic Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sakaka Photovoltaic Solar Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Sakaka, Al Jouf, Saudi Arabia. Taiyo aggregates data on it from Mercomindia.com.

Participants

Company

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Sakaka Photovoltaic Solar Project in Sakaka City, Al Jouf Province, Saudi Arabia, was launched in April 2021. It has a capacity of 300 MW and is the first utility-scale renewable energy project under the Custodian of the Two Holy Mosques Renewable Energy Initiative.

Original sector

Energy

Budget

Location

Country

Saudi Arabia

State

Al Jouf

City

Sakaka

Source

Source

Mercomindia.com

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar

Article published date

2025-04-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project