Sakarya Gas Field Third Phase Development
Sector: Oil and Gas • Location: Filyos, Türkiye
Source: Offshore Engineer Magazine
The third phase of the Sakarya gas field development project involves the engineering, procurement, construction and installation of eight rigid flowlines and a 24-inch diameter Gas Export Pipeline approximately 183 km long, connecting the offshore field to the onshore facility in Filyos, Türkiye. It includes a new dedicated floating production unit fed by 27 wells in the Sakarya and Amasra fields
- Status
- Closed
- Sector
- Oil and Gas
- Location
- Filyos, Turkey
- Updated
- 22 Jul 2026
- Source
- Offshore Engineer Magazine
ConstructChat
Ask ConstructChat about Sakarya Gas Field Third Phase Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The third phase of the Sakarya gas field development project involves the engineering, procurement, construction and installation of eight rigid flowlines and a 24-inch diameter Gas Export Pipeline approximately 183 km long, connecting the offshore field to the onshore facility in Filyos, Türkiye. It includes a new dedicated floating production unit fed by 27 wells in the Sakarya and Amasra fields. |
Original sector | Oil and Gas |
Budget |
Location
Country | Turkey |
City | Filyos |
Source
Source | Offshore Engineer Magazine |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
