Sakarya Phase 3 Subsea Development
The owner, status and timeline of this project. A free account opens every field.
Source: Upstream Online
Subsea7 has been awarded a contract by Turkish Petroleum Offshore Technology Center (TP-OTC) to build out the subsea umbilical, riser and flowline (SURF) system for the third phase of the Sakarya gas project in the Black Sea. The project involves engineering, procurement, construction and installation (EPCI) work to support a 32-well subsea system and a new floating production unit to boost gas ou
- Status
- Closed
- Sector
- Oil and Gas
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- Upstream Online
ConstructChat
Ask ConstructChat about Sakarya Phase 3 Subsea Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Subsea7 has been awarded a contract by Turkish Petroleum Offshore Technology Center (TP-OTC) to build out the subsea umbilical, riser and flowline (SURF) system for the third phase of the Sakarya gas project in the Black Sea. The project involves engineering, procurement, construction and installation (EPCI) work to support a 32-well subsea system and a new floating production unit to boost gas output to 40 million cubic metres per day. |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | Upstream Online |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
