logo

Sakosa Sabanci-Kosa Endustriyel Iplik Ve Kord Bezi Sanayi Ve Ticaret

Sector: Waste Processing and Treatment • Location: Turkiye

Source: International Finance Corporation (IFC)

Project
Completed
  • 2 -International Finance CorporationA Member of the World Bank GroupEnvironmental Review Summary (ERS)Project Name: TURKEY: SAKoSaRegion: Central and Southern Europe DepartmentSector: Textile Project No: 0093761 The Company is expected to start commercial production at its plant, currently under construction in Ýzmit, Turkey, in the second half of 1999. The project has two phases. In the first

Project Information FAQ

Project Information

4 Q
The project “Sakosa Sabanci-Kosa Endustriyel Iplik Ve Kord Bezi Sanayi Ve Ticaret” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Turkiye. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

- 2 -International Finance CorporationA Member of the World Bank GroupEnvironmental Review Summary (ERS)Project Name: TURKEY: SAKoSaRegion: Central and Southern Europe DepartmentSector: Textile Project No: 0093761 The Company is expected to start commercial production at its plant, currently under construction in Ýzmit, Turkey, in the second half of 1999. The project has two phases. In the first phase, SAKoSa will produce 7,000 tons/year “PET HMLS” polyester yarn and 7,000 tons/year tire cord fabric with the produced yarn. The second phase will bring the production capacity to 14,000 tons/year yarn, of which 12,000 tons/year will be converted in-house into tire cord fabric. This phase is expected to be completed by in the first quarter of 2001.2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of the project consisted of appraising technical and environmental information submitted by the project sponsor by IFC’s Environment staff. The following potential environmental, health and safety impacts of the project were analyzed:· site selection;· liquid effluents;· solid and liquid waste handling and disposal;· employee training;· occupational health & safety.The sponsor has provided information about how these potential impacts will be addressed and demonstrate the proposed project will comply with applicable local regulations and World Bank policies and guidelines. This information is summarized in the paragraphs that follow. 3. The facility is located in an approximately 61,500m2 lot in an small-scale industrial area at the border of the Alikahya village in Izmit, Turkey. The site was acquired through direct purchase from the industrial estate owners. This transaction did not cause resettlement of communities or economical displacement and the site is not located near sensitive areas. 4. The power needs are going to be supplied by Energisa, the local power utility. The project will not release air emissions to the atmosphere.5. Water for the operations will be obtained from wells. The project will generate process and domestic waters which will be pre-treated on-site prior being discharged to the municipal wastewater treatment facility. The pre-treatment facilities will consist of biological and chemical treatment. 6. The solid waste generated includes production and domestic wastes. Production waste is baled and sold whilst the domestic wastes and the sludge generated in the wastewater treatment facility are disposed in a government authorized landfill.7. The sponsor will provide and require SAKoSa employees the use of personal protective equipment including safety shoes, gloves, masks, safety glasses, etc and will periodically train the employees in health and safety issues complying thereby with the applicable World Bank health and safety guidelines. 8. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that SAKoSa proposed project is being designed to meet World Bank environmental, health and safety policies and guidelines and host country requirements.9. IFC will monitor ongoing compliance with World Bank environmental, health and safety policies and guidelines during the lifetime of the project by evaluating reports submitted annually to IFC by SAKoSa and by conducting periodic supervision.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data