logo
ProjectActive

Salado Integrated River Basin Management Support Project

Sector: Water Supply and Storage • Location: Argentina

Source: World Bank Group

The objective of the Salado Integrated River Basin Management Support Project for Argentina is to enhance flood protection and strengthen the capacity of the responsible institutions for integrated water resources monitoring and management in the Salado River Basin. The project has 3 components. (1) Integrated water resources management component will strengthen institutional capacity for water re

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government
Location
Argentina
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Salado Integrated River Basin Management Support Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Salado Integrated River Basin Management Support Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The objective of the Salado Integrated River Basin Management Support Project for Argentina is to enhance flood protection and strengthen the capacity of the responsible institutions for integrated water resources monitoring and management in the Salado River Basin. The project has 3 components. (1) Integrated water resources management component will strengthen institutional capacity for water resources management and environmental and hydrological monitoring at different levels, through the implementation of non‐structural measures of the PMI, contributing to a holistic and sustainable management approach. (2) River training works and upgrading associated infrastructure component will allow completion of the river training works on the lower Salado River (223 km in Sections I, II and III), and continue to expand the structural measures to reduce the impact of the increased trend in precipitation in the basin. (3) Project implementation, supervision and communication component will support the Project Works Coordination and ExecutionUnit (UCEPO) in project management, including the carrying out of the project audits, and Provincial Department of Hydraulic Works (DPOH) in the supervision of the river works. It will finance communication activities, a technical assistance to support a Users’ Oversight Committee. It will also support the development of a Grievance Redress Mechanism (GRM).

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Argentina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Forest Products and Packaging, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project