logo

Salado Integrated River Basin Management Support Project

Sector: Water Supply and Storage • Location: Argentina

Source: World Bank

Project
Active

The objective of the Salado Integrated River Basin Management Support Project for Argentina is to enhance flood protection and strengthen the capacity of the responsible institutions for integrated water resources monitoring and management in the Salado River Basin. The project has 3 components. (1) Integrated water resources management component will strengthen institutional capacity for water re

Project Information FAQ

Project Information

5 Q
The project “Salado Integrated River Basin Management Support Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Argentina. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Salado Integrated River Basin Management Support Project for Argentina is to enhance flood protection and strengthen the capacity of the responsible institutions for integrated water resources monitoring and management in the Salado River Basin. The project has 3 components. (1) Integrated water resources management component will strengthen institutional capacity for water resources management and environmental and hydrological monitoring at different levels, through the implementation of non‐structural measures of the PMI, contributing to a holistic and sustainable management approach. (2) River training works and upgrading associated infrastructure component will allow completion of the river training works on the lower Salado River (223 km in Sections I, II and III), and continue to expand the structural measures to reduce the impact of the increased trend in precipitation in the basin. (3) Project implementation, supervision and communication component will support the Project Works Coordination and ExecutionUnit (UCEPO) in project management, including the carrying out of the project audits, and Provincial Department of Hydraulic Works (DPOH) in the supervision of the river works. It will finance communication activities, a technical assistance to support a Users’ Oversight Committee. It will also support the development of a Grievance Redress Mechanism (GRM).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data