Sale of the Felton Thermoelectric Plant
The status, timeline and source of this project. A free account opens every field.
Source: CiberCuba
The Felton Thermoelectric Plant, also known as the Lidio Ramón Pérez Thermal Power Plant, has faced ongoing issues, including a recent disconnection from the National Electric System due to a false alarm. This incident reflects the broader energy crisis in Cuba, characterized by frequent blackouts and maintenance challenges.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Geothermal
- Location
- Cuba
- Updated
- 22 Jul 2026
- Source
- CiberCuba
ConstructChat
Ask ConstructChat about Sale of the Felton Thermoelectric Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Felton Thermoelectric Plant, also known as the Lidio Ramón Pérez Thermal Power Plant, has faced ongoing issues, including a recent disconnection from the National Electric System due to a false alarm. This incident reflects the broader energy crisis in Cuba, characterized by frequent blackouts and maintenance challenges. |
Original sector | Energy |
Location
Country | Cuba |
Source
Source | CiberCuba |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
