Salesforce Transit Center
Sector: Car parking • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Salesforce Transit Center Share this: Facebook Twitter LinkedIn Project Introduction The Salesforce Transit Center project is a major new regional transit hub just south of Mission Street between Second and Beale streets in downtown San Francisco. Phase One of the project connects the bus services of AC Transit, WestCAT, Greyhound and Amtrak Thruway bus service with Muni service in San Francisco.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | implementation / construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Salesforce Transit Center Share this: Facebook Twitter LinkedIn Project Introduction The Salesforce Transit Center project is a major new regional transit hub just south of Mission Street between Second and Beale streets in downtown San Francisco. Phase One of the project connects the bus services of AC Transit, WestCAT, Greyhound and Amtrak Thruway bus service with Muni service in San Francisco. Phase Two of the project will bring in Caltrain train service from the peninsula and eventually California High Speed Rail trains from Southern California into an underground station. The multi-level building (four stories above grade and two below) includes a rooftop public park, retail space, bicycle parking and administrative offices. The Transit Center will be the terminus for the Muni 5, 5R, 7, 25 Owl, 38 and 38R routes at the Bus Plaza and the 25 on the Bus Deck. The 14, 14R and 14X routes serve stops nearby on Mission Street. The 10 and 12 routes serve stops nearby at 2nd St & Howard. Muni schedules for the Salesforce Transit Center are found on the Routes & Stops web page for each bus line: 5 Fulton 5R Fulton Rapid 7 Haight/Noriega 10 Townsend 12 Folsom/Pacific 14 Mission 14R Mission Rapid 14X Mission Express 25 Treasure Island 38 Geary 38R Geary Rapid 714 BART Early Bird Project Timeline Summer 2010 Demolition of Transbay Terminal Completed Spring 2018 Phase 1a: First Level Bus Plaza Completed Summer 2018 Phase 1b: Third Level Bus Deck, Rooftop Park Completed 2019 Phase 1c: Second Level Retail, Office Space Pending 2020 - 2025 Phase 2: Below Ground, Rail Service Pending Project Status Implementation / Construction Bus Routes and Rail Lines 5 Fulton 5R Fulton Rapid 6 Haight/Parnassus 7 Haight/Noriega 14 Mission 14X Mission Express (Suspended) 25 Treasure Island 38 Geary 38R Geary Rapid 714 BART Early Bird Neighborhoods Financial District South of Market (SoMa) Transit Center Highlights The Salesforce Transit Center will become the “Grand Central Station” of the west, a fully integrated transit hub capable of getting people to any major destination in the region from one central location using only public transportation. The major project elements include: Two-block-long bus deck with direct freeway access for AC Transit, WestCAT, Amtrak Thruway and Greyhound buses and Muni service to Treasure Island (25) A ground level bus plaza serving six major Muni lines (5/5R, 7 and 38/38R) A three-platform, 6-track train station underground A Grand Hall entrance lobby and a rooftop park Ancillary projects include a public plaza on Mission Street west of Fremont Street and the Salesforce Tower off Mission Street east of First Street. Partnering with the SFMTA The Transbay Joint Powers Authority (TJPA) manages and operates the Salesforce Transit Center. As a partner agency, SFMTA provided technical support and design input for the project with transit power infrastructure for Muni buses and the design of the street level bus plaza. SFMTA traffic engineering has and will continue to help guide construction on city streets for necessary utility relocations and construction of the below grade train box. Project History The original Transbay Terminal at First and Mission streets, opened in 1939 and was a regional transit hub for over 60 years. It was closed in 2010 to make way for a new world-class transit center that will serve the region. While construction of the new Salesforce Transit Center took place, a Temporary Transbay Terminal served Muni and AC Transit for 8 years, ensuring our customers were able to continue traveling to and from the heart of downtown San Francisco from all over the region. Muni began serving the Salesforce Transit Center in 2017, when the 5 Fulton moved to the Bus Plaza . In 2018, the 5R, 7, 38 and 38R also moved to the Bus Plaza , with the 25 Treasure Island and all other transit agencies moving in for Transit Center's offical grand opening event held in August 2018 . The Transit Center was temporarily closed September 25, 2018 when a fissure was discovered on a beam at the Fremont Street location. After repairs and inspections completed, the Transit Center re-opened to the public on July 1, 2019. For details about the repairs, visit the Salesforce Transit Center website . Check out the video from our partner TJPA about the history of the original Transbay Terminal and the design of the new Transit Center. Funding Funding for the project is provided through TJPA and includes federal grants, proceeds from the sale of state property in the area, loans and local (SF) sources. Contact Information salesforcetransitcenter@lpc.com info@tjpa.org |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
