Salinas - Garner Avenue Bus Bulb Out
Sector: Water Supply and Storage • Location: Salinas, California, United States of America
Source: Dodge
Scope of Services In general, the work shall include, but is not limited to the removal of existing concrete sidewalk, curb and gutter, asphalt concrete pavement, storm drain pipe, signage, and existing pavement markings. The work also includes the construction and installation of new concrete curb and gutter, concrete sidewalk, concrete ADA curb ramps, installation of new HDPE storm drain pipe, s
- Status
- Closed
- Sector
- Water Supply and Storage, Rail, Cement, Mass Transit, Road, Government, Waste Processing and Treatment, Car parking, Automotive, Commercial
- Location
- Salinas, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Salinas - Garner Avenue Bus Bulb Out
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Services In general, the work shall include, but is not limited to the removal of existing concrete sidewalk, curb and gutter, asphalt concrete pavement, storm drain pipe, signage, and existing pavement markings. The work also includes the construction and installation of new concrete curb and gutter, concrete sidewalk, concrete ADA curb ramps, installation of new HDPE storm drain pipe, storm drain catch basin, storm drain manhole, application of 6 and 12 type A hot mix asphalt, inst... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Salinas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Cement, Mass Transit, Road, Government, Waste Processing and Treatment, Car parking, Automotive, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
