Saline Township Hyperscale Data Center Campus
Sector: Power Generation (CCGT) • Location: Saline Township, Michigan, United States
Source: The Detroit News
A 250-acre hyperscale data center campus in Saline Township being developed by OpenAI, Oracle, and a real estate development company tied to billionaire Stephen Ross. The campus is planned to open in 2026 and will require 1.4 gigawatts of power, approximately the amount needed to supply 1 million homes.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Data Center, Residential, Commercial
- Location
- Saline Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- The Detroit News
ConstructChat
Ask ConstructChat about Saline Township Hyperscale Data Center Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 250-acre hyperscale data center campus in Saline Township being developed by OpenAI, Oracle, and a real estate development company tied to billionaire Stephen Ross. The campus is planned to open in 2026 and will require 1.4 gigawatts of power, approximately the amount needed to supply 1 million homes. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Michigan |
City | Saline Township |
Source
Source | The Detroit News |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center, Residential, Commercial |
Article published date | 2025-11-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
