logo

Salisbury - Polishing Pond Berm Stabilization

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

The project includes the rehabilitation of the interior of north and south containment berms of the wastewater polishing pond. The polishing pond is located along the north bank of the Petitcodiac River south of Jill Street in Salisbury and serves as the final clarification step for wastewater effluent from the wastewater treatment facility before it is discharged into the river. Natural erosion h

Status
Closed
Sector
Water Supply and Storage, Road, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Salisbury - Polishing Pond Berm Stabilization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Salisbury - Polishing Pond Berm Stabilization” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes the rehabilitation of the interior of north and south containment berms of the wastewater polishing pond. The polishing pond is located along the north bank of the Petitcodiac River south of Jill Street in Salisbury and serves as the final clarification step for wastewater effluent from the wastewater treatment facility before it is discharged into the river. Natural erosion has deteriorated the inside slopes of the pond’s containment berms, which threatens the structural integrity of the berms and makes maintenance access difficult. Reinforcement of the interior and widening of the top of the berms is necessary to prevent berm failure and facilitate regular maintenance activities. Similar work was performed on the interior of the west containment berm in 2014 as a response to damage caused by a flooding event and preventive reconstruction work was perform on the interior of the east berm in 2018 due to significant natural erosion. Also, due to the polishing pond’s proximity to the Petitcodiac River, the exterior of the pond’s southwest berm is subjected to erosion from the powerful tidal action of the river and has resulted in significant erosion along the outer surface of the containment berm. Failure of any portion of the pond’s containment berms could result in the premature release of the effluent into the river and/or into an adjacent provincially significant wetland that was developed by Ducks Unlimited. The project will involve the following: - addition of fill material (borrow, granular base, and riprap) to repair, reinforce and widen the interior of the containment berm on the north and south sides of the polishing pond (approximately 280 m total length) - erosion protection on approximately 50m of the exterior of the southeast corner of the containment berm of the polishing pond - installation of sediment and erosion control structures - reinstatement of all landscaped areas

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project