The EBRD is considering making an equity investment of up to US$ 5 milion in Clean Energy LLC to support the development, construction and operation of a 50MW wind farm to be constructed and operated 70km from Mongolia’s capital Ulaanbaatar. The project will be the first renewable energy project and the first privately-owned generator connecting to the Central Grid in Mongolia. The investment foll

Status
Closed
Sector
Road, Government, Wind, Raw Materials, Residential, Commercial
Location
Mongolia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Salkhit Windfarm Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Salkhit Windfarm Development” is an infrastructure initiative in the Road sector, located in Mongolia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The EBRD is considering making an equity investment of up to US$ 5 milion in Clean Energy LLC to support the development, construction and operation of a 50MW wind farm to be constructed and operated 70km from Mongolia’s capital Ulaanbaatar. The project will be the first renewable energy project and the first privately-owned generator connecting to the Central Grid in Mongolia. The investment follows an early development equity investment made by the EBRD in 2009. The transition impact of the project stems primarily from the following: Clean Energy LLC is a special purpose vehicle incorporated in Mongolia solely to develop the project. It is 75 percent owned by Newcom Group, one of Mongolia's leading commercial groups, and 25 percent owned by EBRD. A US$ 5 million equity investment in Clean Energy LLC. Equity co-financing is expected to come from Newcom, a strategic investor, and other development institutions. US$ 115 million. The Project was categorized as B level, initially for the debt financing project under the Bank's 2003 Environmental Policy and then the equity financing under the 2008 Environmental and Social Policy. The environmental and social due diligence was designed to meet the requirements of both policies. Potential impacts of the Project are readily identifiable and able to properly mitigated. Due diligence determined the Company has the capacity to fully implement the Bank's Performance Requirements throughout the wind farm development, construction, operation and decommissioning. An international consultant completed an Environmental and Social Impact Assessment (ESIA) in 2008, with a 60-day disclosure and comment period. The ESIA package - ESIA, Stakeholder Engagement Plan, NonTechnical Summary, and Environmental and Social Action Plan (ESAP) - are available on Newcom’s website, with links to the documents also found on EBRD’s website. The ESIA evaluated the potential impacts of construction and operation of the wind turbines and the associated substation, access roads, and transmission line. The assessment included surveys of large birds. The ESAP included tailored measures to mitigate potential impacts on birds and from construction-related erosion, and also a robust monitoring program during bird migration and breeding seasons during operation. The Bank will monitor implementation of the ESAP throughout the life of the project. Non Technical Summary The Government of Japan, through the Japan-Europe Cooperation Fund, provided €290,000 to assist the Mongolian government and energy regulator to develop the regulatory framework for renewable energy. The Government of Luxembourg provided €76,000 to assist in the preparation of the ESIA for the windfarm. Neal Detert Project Manager Tel: (+976) 11-313-183 Ext. 61 E-mail: neal@newcom.mn

Original sector

Energy

Location

Country

Mongolia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Government, Wind, Raw Materials, Residential, Commercial

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project