Salley Warehouse
Sector: Power Transmission • Location: Rogers, Arkansas, United States of America
Source: Dodge USA
The subject application is for a 74,113 square foot building utilized for light assembly and shipment of conveyor belts to used for food packaging equipment. Approximately 7,284 square feet of the building will be for an office and the remaining 66,829 square feet will be for a warehouse. The facility is projected to have 45 to 50 employees, with the potential capacity of 80 employees within 3 to
- Status
- Prospective
- Sector
- Power Transmission, Steel, Airport, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Residential, Warehouse
- Location
- Rogers, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Salley Warehouse
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The subject application is for a 74,113 square foot building utilized for light assembly and shipment of conveyor belts to used for food packaging equipment. Approximately 7,284 square feet of the building will be for an office and the remaining 66,829 square feet will be for a warehouse. The facility is projected to have 45 to 50 employees, with the potential capacity of 80 employees within 3 to 5 years. The hours of operation are 8am-5pm Monday through Friday. Delivery times can vary from 8... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Rogers |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Steel, Airport, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Residential, Warehouse |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
