Salt Spring Elementary Plant Replacement - Phase 1
One of 10,000+ projects Taiyo tracks in British Columbia.
Source: Dodge USA
The scope of HVAC work for this project generally includes: .1 Propane-fired heating boilers. .2 Hydronic heating pumps .3 Heating water piping and pipe insulation .4 Pre-operational pipe cleaning and Chemical treatment .5 Direct Digital Controls .6 Water systems balancing .7 Verification of systems operation and controls .4 Plumbing work will include the following: .1 Propane gas piping inside th
- Status
- Under Construction
- Sector
- Commercial, Water Supply and Storage, Chemical (Industrial), Government, Education, Manufacturing (Industrial)
- Location
- Salt Spring Island, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Salt Spring Elementary Plant Replacement - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of HVAC work for this project generally includes: .1 Propane-fired heating boilers. .2 Hydronic heating pumps .3 Heating water piping and pipe insulation .4 Pre-operational pipe cleaning and Chemical treatment .5 Direct Digital Controls .6 Water systems balancing .7 Verification of systems operation and controls .4 Plumbing work will include the following: .1 Propane gas piping inside the building and hook-up to the boilers. .2 Domestic water pre-heat. .5 Demolition and builder?s wo... |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Salt Spring Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Chemical (Industrial), Government, Education, Manufacturing (Industrial) |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
