Salt Springs Road Waterline Replacement Phase 1
Sector: Water Supply and Storage • Location: Niles, Ohio, United States of America
Source: Dodge USA
Salt Springs Road Waterline Replacement Phase 1 .The work to be performed on this project generally consists of the installation of approximately 1,800 linear feet of 8-inch waterline, removal and replacement of existing hydrants, curb stop and service line replacements within the Citys project right-of-way, and all required backfill and restoration.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Road
- Location
- Niles, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Salt Springs Road Waterline Replacement Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Salt Springs Road Waterline Replacement Phase 1 .The work to be performed on this project generally consists of the installation of approximately 1,800 linear feet of 8-inch waterline, removal and replacement of existing hydrants, curb stop and service line replacements within the Citys project right-of-way, and all required backfill and restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Niles |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Road |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
