Salto Apiacas Hydro Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In August 2013, the company Enel Brasil Participacoes S/A was awarded in a competitive bidding process the contract to build and operate a hydro power plant (45 MW) located at the Apiacas River, state of Mato Grosso. The names of other bidders were not disclosed.

The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. Enel Brasil presented the lowest offer, a value of US$ 5

Project Information FAQ

Project Information

5 Q
The project “Salto Apiacas Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In August 2013, the company Enel Brasil Participacoes S/A was awarded in a competitive bidding process the contract to build and operate a hydro power plant (45 MW) located at the Apiacas River, state of Mato Grosso. The names of other bidders were not disclosed. The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. Enel Brasil presented the lowest offer, a value of US$ 51.1/MWh (BRL 120/MWh). The contract was signed in March 2014, and sponsors created the company Enel Green Power Salto Apiacas S.A. to lead the project during the 35-year contract period. Enel Green Power Salto Apiacas S.A. committed to sell 100% of the output to the regulated market .The company Constran Engenharia was hired to conduct the EPC works for the project and supply equipment. The sponsor committed to invest US$ 72.2 million (BRL 178.4 million) in the power plant. The sponsor announced initially that the project would be financed solely with equity, but a financing deal was approved in May 2016 in which the project was granted a 1-year bullet promissory notes of US$ 29.6 million provided by Banco Santander. Construction works commenced in March of 2014 and operations were expected to begin by 2017. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data