Salto Apiacas Hydro Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In August 2013, the company Enel Brasil Participacoes S/A was awarded in a competitive bidding process the contract to build and operate a hydro power plant (45 MW) located at the Apiacas River, state of Mato Grosso. The names of other bidders were not disclosed.

The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. Enel Brasil presented the lowest offer, a value of US$ 5

Status
Prospective
Sector
Commercial, Government, Hydro, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Salto Apiacas Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Salto Apiacas Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In August 2013, the company Enel Brasil Participacoes S/A was awarded in a competitive bidding process the contract to build and operate a hydro power plant (45 MW) located at the Apiacas River, state of Mato Grosso. The names of other bidders were not disclosed. The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. Enel Brasil presented the lowest offer, a value of US$ 51.1/MWh (BRL 120/MWh). The contract was signed in March 2014, and sponsors created the company Enel Green Power Salto Apiacas S.A. to lead the project during the 35-year contract period. Enel Green Power Salto Apiacas S.A. committed to sell 100% of the output to the regulated market .The company Constran Engenharia was hired to conduct the EPC works for the project and supply equipment. The sponsor committed to invest US$ 72.2 million (BRL 178.4 million) in the power plant. The sponsor announced initially that the project would be financed solely with equity, but a financing deal was approved in May 2016 in which the project was granted a 1-year bullet promissory notes of US$ 29.6 million provided by Banco Santander. Construction works commenced in March of 2014 and operations were expected to begin by 2017. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Hydro, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project