logo

Salto do Curua Small Hydro Power Plant

Active · Brazil

Source: World Bank Group

Project
Active

The Brazilian company Eletrotecnica Tangara Ltda (ELTAN) was granted an authorization to build and operate a 30-MW small hydro power plant located in the Curua River, state of Para (in the municipality of Altamira). The 30-year contract was signed with the federal regulatory agency ANEEL in July 2002.

ELTAN committed to invest US$ 86.2 million (BRL 168.2 million) in the construction of PCH Sa

Status
Prospective
Sector
Commercial, Government, Hydro, Power Generation (CCGT)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Salto do Curua Small Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Salto do Curua Small Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Eletrotecnica Tangara Ltda (ELTAN) was granted an authorization to build and operate a 30-MW small hydro power plant located in the Curua River, state of Para (in the municipality of Altamira). The 30-year contract was signed with the federal regulatory agency ANEEL in July 2002. ELTAN committed to invest US$ 86.2 million (BRL 168.2 million) in the construction of PCH Salto Curua. Financial closure for the project was reached in 2007 when the company was granted a US$ 62.2 million (BRL 121.4 million) syndicated loan by the state owned bank BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. The special purpose company Curua Energia S.A. was created to manage the project. In 2007, the ownership of Curua Energia was transferred to Mafe Energia e Participacoes S.A. Construction works on the power plant started in 2007, and the unit became operational in 2008. Curua Energia signed a power purchase agreement with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies) but the contract was revoked soon after the signing.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Hydro, Power Generation (CCGT)

Article published date

2024-06-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project