Salto do Curua Small Hydro Power Plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Brazilian company Eletrotecnica Tangara Ltda (ELTAN) was granted an authorization to build and operate a 30-MW small hydro power plant located in the Curua River, state of Para (in the municipality of Altamira). The 30-year contract was signed with the federal regulatory agency ANEEL in July 2002.
ELTAN committed to invest US$ 86.2 million (BRL 168.2 million) in the construction of PCH Sa
- Status
- Prospective
- Sector
- Commercial, Government, Hydro, Power Generation (CCGT)
- Location
- Nevada, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Salto do Curua Small Hydro Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Brazilian company Eletrotecnica Tangara Ltda (ELTAN) was granted an authorization to build and operate a 30-MW small hydro power plant located in the Curua River, state of Para (in the municipality of Altamira). The 30-year contract was signed with the federal regulatory agency ANEEL in July 2002. ELTAN committed to invest US$ 86.2 million (BRL 168.2 million) in the construction of PCH Salto Curua. Financial closure for the project was reached in 2007 when the company was granted a US$ 62.2 million (BRL 121.4 million) syndicated loan by the state owned bank BNDES. The remaining cost was set to be financed with the sponsors’ internal resources. The special purpose company Curua Energia S.A. was created to manage the project. In 2007, the ownership of Curua Energia was transferred to Mafe Energia e Participacoes S.A. Construction works on the power plant started in 2007, and the unit became operational in 2008. Curua Energia signed a power purchase agreement with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies) but the contract was revoked soon after the signing. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Nevada |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Hydro, Power Generation (CCGT) |
Article published date | 2024-05-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
