Salto do Rio Verdinho HPP

One of 10,000+ projects Taiyo tracks in Brazil.

Source: World Bank Group

Project
Active

On October 31, 2007, Triunfo Participacoes e Investimentos(TPI) transferred 100% of its shares in Rio Verdinho Energia SA, project company of the 93 MW Salto do Rio Verdinho Hydroelectric Power Plant, to Companhia Brasileira de Aluminio (CBA), a subsidiary of Grupo Votorantim. The Salto do Rio Verdinho HPP was to be located in Goias state in the municipality of Cacu. Rio Verdinho Energia SA was i

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Hydro, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Salto do Rio Verdinho HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Salto do Rio Verdinho HPP” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On October 31, 2007, Triunfo Participacoes e Investimentos(TPI) transferred 100% of its shares in Rio Verdinho Energia SA, project company of the 93 MW Salto do Rio Verdinho Hydroelectric Power Plant, to Companhia Brasileira de Aluminio (CBA), a subsidiary of Grupo Votorantim. The Salto do Rio Verdinho HPP was to be located in Goias state in the municipality of Cacu. Rio Verdinho Energia SA was included in the Growth Acceleration Program (PAC) and, together with Rio Verde Energia SA (Salto Hydrelectric Power Plant, project #5196) amounted to 201 MW of installed power and an average of 122 MW of power assured to the Brazilian Interconnected System. The license to construct and operate the Salto Hydroelectric Power Plant and the Salto do Rio Verdinho Hydroelectric Power Plant was awarded to Triunfo Participacoes e Investimentos (TPI) by Aneel on July 12, 2002 in a competitive tender. The number of final bids was not known, but 13 bidders were prequalified to bid on the Salto do Verdinho HPP. The bidding criterion was the highest annual payment to the government over the 35 year contract. TPI acquired Salto (108 MW) and Salto do Rio Verdinho (93 MW) concessions for R$450,000 and R$410,000, respectively. The total project cost was estimated at R$ 342.4 million (US $187.1 million). In August 2008, BNDES approved financing of R$ 250 million (US $136.6 million) for the Salto do Rio Verdinho Power Plant which corresponded to 73% of the project’s total investment. The remaining 27% was to be financed through the sponsor’s equity. Due to its obligations in the auction, CBA was to pay approximately 4.0 million real (US $2.2 million) over the 35 year contract. Commercial operations commenced in July 2010.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Hydro, Government

Article published date

2024-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project