logo

Salto Pilao Hydro Power Plant

One of 10,000+ projects Taiyo tracks in Brazil.

Source: World Bank Group

Project
Active

In December 2001, the Brazilian company Consorcio Empresarial Salto Pilao-CESAP was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 182.3-MW hydro power plant located in the Itajai River, state of Santa Catarina. CESAP was established as a partnership of Companhia Brasileira de Aluminio (60%), a wholly-owned sub

Status
Prospective
Sector
Commercial, Government, Hydro, Power Generation (CCGT)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Salto Pilao Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Salto Pilao Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2001, the Brazilian company Consorcio Empresarial Salto Pilao-CESAP was awarded in a competitive bidding process organized by the federal regulatory agency Aneel the 35-year contract to build and operate a 182.3-MW hydro power plant located in the Itajai River, state of Santa Catarina. CESAP was established as a partnership of Companhia Brasileira de Aluminio (60%), a wholly-owned subsidiary of Votorantim, Camargo Correa Energia (20%), and government-owned DME Energetica (20%). Information on the other bidders was not available. The bidding criteria set by the federal regulatory agency ANEEL was the highest payment to the government for the concession rights. The company agreed to pay US$ 7 million (BRL 17 million) in yearly installments during the life of the contract, starting once operations commence (using a discount rate of 10%, the present value of this contribution was estimated at US$ 104 million). The contract was signed in April 2002, and sponsor created the company Ourinhos Energia to lead the project during the 35-year contract period. The sponsor committed to invest US$ 205.8 million (BRL 500 million) in the power plant. Financial closure was achieve in June 2005, when the state-owned bank BNDES granted a US$ 113.3 million (BRL 275.4 million) loan to CESAP. The remaining cost was set to be financed with equity. Construction works started in August 2006, and operations commenced by December 2009.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Hydro, Power Generation (CCGT)

Article published date

2024-06-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project