Salud Integral De La Montana Building
Sector: Consumer Products • Location: Orlando, Florida, United States of America
Source: Dodge
Omd Scope Of Work Interior Demolition Of Approximately 5,721sf. This Will Include Selective Demolition Of Second Floor Corridor, And Third Floor Exterior East Wall. Placement Of Temporary Partitions To Maintain Access To Interior Tenant Elevator During The Main Entry Buildout. Reworking Of Existing Roof System To Tie The Existing Building Into New Building. Construction Of Approximately 79sf Exten
- Status
- Prospective
- Sector
- Consumer Products, Hospital, Commercial
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Salud Integral De La Montana Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Omd Scope Of Work Interior Demolition Of Approximately 5,721sf. This Will Include Selective Demolition Of Second Floor Corridor, And Third Floor Exterior East Wall. Placement Of Temporary Partitions To Maintain Access To Interior Tenant Elevator During The Main Entry Buildout. Reworking Of Existing Roof System To Tie The Existing Building Into New Building. Construction Of Approximately 79sf Extension On The Third Floor. New Interior Lvt And Paint To Match Existing. Construction Of Approximat... |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Hospital, Commercial |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
