logo

Saluda Grade Rail Trail

Sector: Mass Transit • Location: Landrum, South Carolina, United States

Source: Post and Courier

Project
Planned

The Saluda Grade Rail Trail is a 31-mile trail planned along the old Saluda Grade railway, running from Inman to Zirconia, North Carolina, passing through several foothills towns. The project includes 15 miles of trail in South Carolina, with a 12-foot-wide asphalt trail in rural areas and a 16-foot-wide trail through downtown Landrum, including concrete sections for connections to sidewalks and d

Project Information FAQ

Project Information

4 Q
The project “Saluda Grade Rail Trail” is an infrastructure initiative in the Mass Transit sector, located in Landrum, South Carolina, United States. Taiyo aggregates data on it from Post and Courier.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Saluda Grade Rail Trail is a 31-mile trail planned along the old Saluda Grade railway, running from Inman to Zirconia, North Carolina, passing through several foothills towns. The project includes 15 miles of trail in South Carolina, with a 12-foot-wide asphalt trail in rural areas and a 16-foot-wide trail through downtown Landrum, including concrete sections for connections to sidewalks and developments. Spartanburg County has requested the release of a $6 million federal HUD grant to fund pre-construction work, including surveying, engineering, and permitting. The northernmost 5-mile section is prioritized for pre-construction, with plans to seek additional funding from the Appalachian Regional Commission for construction. The trail is planned to be built in stages dependent on funding, with potential trail completion by the end of 2028.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data