Salumbar Banswara State Highway

Sector: Road • Location: India

Source: World Bank Group

Project
Active

On 22nd December 2011, the Government of Rajasthan awarded a concession of 8-years 5-months and 5-days (including 15 month construction period) to GHV India Private Limited for the strengthening, improvement, 2-laning,operation and maintenance, and tolling of 93kms of Salumbar–Banswara section of road comprising SH-32 (72/000 to 165/000), in the state of Rajasthan.

Under the contract, GHV was re

Status
Prospective
Sector
Road, Waste Processing and Treatment, Bridge, Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Salumbar Banswara State Highway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Salumbar Banswara State Highway” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On 22nd December 2011, the Government of Rajasthan awarded a concession of 8-years 5-months and 5-days (including 15 month construction period) to GHV India Private Limited for the strengthening, improvement, 2-laning,operation and maintenance, and tolling of 93kms of Salumbar–Banswara section of road comprising SH-32 (72/000 to 165/000), in the state of Rajasthan. Under the contract, GHV was responsible for the design, construction, finance, operation and maintenance,strengthening and 2-laning the existing carriageway of Salumbar–Banswara of SH32 with paved shoulders. The scope included construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts,road intersections, interchanges, drains, traffic signages, traffic safety measures, etc. This road upgradation was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. GHV India Private Limited won the tender through domestic competitive bidding, conducted by PWD Rajasthan, by quoting the lowest concession period of 8-years 5-months and 5-days. Under the contract, GHV was to recover the capital costs and operating costs including returns through tolling during the term of concession. The concession agreement for the project was signed on 13th December 2011. The estimated capital cost of the project at the time of bidding was US$ 9.3mn (INR 463.3mn @ 50 INR/USD). Other details of financing were not available at the time of collection of this information. The construction of 50kms of project road was almost complete and proportionate tolling operation for the stretch had started on 16th August 2012.

Original sector

Transport

Procurement method

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Waste Processing and Treatment, Bridge, Government, Commercial

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project