Salvage work in the Gotthard Base Tunnel
Closed · Switzerland
Source: RailTech
The Swiss Gotthard Base Tunnel was closed following the derailment of freight carriages on 10 August 2023 which caused extensive damage to the infrastructure. It was then partially reopened to rail traffic at midnight on 22 August 2023. The major clearing and recovery work at the site of the accident in the west tube is expected to last until the end of September 2023. Some 22 wagons and two locom
- Status
- Closed
- Sector
- Mass Transit, Tunnel, Rail
- Location
- Switzerland
- Updated
- 22 Jul 2026
- Source
- RailTech
ConstructChat
Ask ConstructChat about Salvage work in the Gotthard Base Tunnel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Swiss Gotthard Base Tunnel was closed following the derailment of freight carriages on 10 August 2023 which caused extensive damage to the infrastructure. It was then partially reopened to rail traffic at midnight on 22 August 2023. The major clearing and recovery work at the site of the accident in the west tube is expected to last until the end of September 2023. Some 22 wagons and two locomotives have already been removed from the tunnel, leaving 8 wagons still in the tunnel. Several are so badly damaged that they need to be dismantled in the tunnel before removal. SBB is also carrying out a detailed survey of the damage caused. This will allow the restoration of the damaged railway installations to begin immediately after the clearing and repair work is completed, at the end of September 2023. |
Location
Country | Switzerland |
Source
Source | RailTech |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Tunnel, Rail |
Article published date | 2024-03-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in Switzerland
- Nant de Drance Pumped Storage Power Station
- Dai monti ai laghi insieme senza auto
- Cross-border multimodal pricing (TMT) — Development and interoperability of distribution tools
- Viaggi, turismo, natura, tra Ossola e Ticino
- Preparatory studies to study the public benefit of the operation of the rail connection to EuroAirport
- Modernisation works of the clocks line
- Strategy for the development and implementation of measures aiming at the improvement of the transport system on the transnational Gaeu-Neckar-Bodensee railway line
- Appearance & Communication
