Salvation Army Building Alteration
Start · Tennessee · Last reported Jul 2025
Source: Dodge
Scope Includes Demolition Of Existing Walls And Construction Of New, Demo Of Existing Finishes And Installation Of New, Reconfiguration Of Existing Light Fixtures, Rework And Addition Of Mechanical Electrical And Plumbing. 28612 sqft
- Status
- Prospective
- Sector
- Residential, Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Memphis, Tennessee, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Salvation Army Building Alteration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Scope Includes Demolition Of Existing Walls And Construction Of New, Demo Of Existing Finishes And Installation Of New, Reconfiguration Of Existing Light Fixtures, Rework And Addition Of Mechanical Electrical And Plumbing. 28612 sqft |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Memphis |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
