Samantha Solar (600 MW) and Storage (600 MW)
Sector: Solar • Location: Ely, Nevada, United States of America
Source: Dodge USA
600 mw facility and 600 MW battery energy storage system (BESS) and interconnection to the regional transmission system on about 2,891 acres of BLM-managed land in White Pine County, about 15 miles W of Ely, NV. Enough power for 174,00 homes. To connect to the existing Robinson Summit substation, affiliated with the new GreenLink North transmission line.
- Status
- Prospective
- Sector
- Solar, Residential, Raw Materials, Energy Storage, Commercial, Power Generation (CCGT), Power Transmission, Consumer Products
- Location
- Ely, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Samantha Solar (600 MW) and Storage (600 MW)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 600 mw facility and 600 MW battery energy storage system (BESS) and interconnection to the regional transmission system on about 2,891 acres of BLM-managed land in White Pine County, about 15 miles W of Ely, NV. Enough power for 174,00 homes. To connect to the existing Robinson Summit substation, affiliated with the new GreenLink North transmission line. |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Ely |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Residential, Raw Materials, Energy Storage, Commercial, Power Generation (CCGT), Power Transmission, Consumer Products |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.