logo
ProjectClosed

Samcheok LNG Terminal

The status, timeline and source of this project. A free account opens every field.

Source: Hyundai Engineering

As the importance of the environment has been recognized and the mandatory use of LNG, which is a pollution-free energy, is expanded to prevent environmental pollution, the government's long-term and stable long-term natural gas supply and demand plan has emerged, such as responding to the rapid increase in domestic LNG demand. In order to establish a stable natural gas supply facility by expandin

Status
Closed
Sector
Commercial, Government, LNG, Natural Gas, Manufacturing (Industrial)
Location
South Korea
Updated
22 Jul 2026
Source
Hyundai Engineering

ConstructChat

Ask ConstructChat about Samcheok LNG Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Samcheok LNG Terminal” is an infrastructure initiative in the Commercial sector, located in South Korea. Taiyo aggregates data on it from Hyundai Engineering.

Participants

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

As the importance of the environment has been recognized and the mandatory use of LNG, which is a pollution-free energy, is expanded to prevent environmental pollution, the government's long-term and stable long-term natural gas supply and demand plan has emerged, such as responding to the rapid increase in domestic LNG demand. In order to establish a stable natural gas supply facility by expanding the storage facilities in the Samcheok production base in a timely manner, Korea Gas Corporation decided to build two 200,000 KL-class above-ground storage tanks and related auxiliary facilities as the second expansion project for phase 2 and the project was awarded to Hyundai E&C.The two Samcheok production base tanks 8 and 9 built as 200,000 KL ground-type LNG storage tanks are 9% Ni plate type tanks, and the project involves participation of 14 first-tier construction companies. It was a large-scale construction involving 12 tank units and auxiliary equipment construction, berthing facilities and unloading facilities at the same time.

Original sector

Plant

Budget

Location

Country

South Korea

Source

Source reliability

High

Source

Hyundai Engineering

URL

More Details

Record type

Project

Sector

Commercial, Government, LNG, Natural Gas, Manufacturing (Industrial)

Article published date

2023-05-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project