Samcheok LNG Terminal
The status, timeline and source of this project. A free account opens every field.
Source: Hyundai Engineering
As the importance of the environment has been recognized and the mandatory use of LNG, which is a pollution-free energy, is expanded to prevent environmental pollution, the government's long-term and stable long-term natural gas supply and demand plan has emerged, such as responding to the rapid increase in domestic LNG demand. In order to establish a stable natural gas supply facility by expandin
- Status
- Closed
- Sector
- Commercial, Government, LNG, Natural Gas, Manufacturing (Industrial)
- Location
- South Korea
- Updated
- 22 Jul 2026
- Source
- Hyundai Engineering
ConstructChat
Ask ConstructChat about Samcheok LNG Terminal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | As the importance of the environment has been recognized and the mandatory use of LNG, which is a pollution-free energy, is expanded to prevent environmental pollution, the government's long-term and stable long-term natural gas supply and demand plan has emerged, such as responding to the rapid increase in domestic LNG demand. In order to establish a stable natural gas supply facility by expanding the storage facilities in the Samcheok production base in a timely manner, Korea Gas Corporation decided to build two 200,000 KL-class above-ground storage tanks and related auxiliary facilities as the second expansion project for phase 2 and the project was awarded to Hyundai E&C.The two Samcheok production base tanks 8 and 9 built as 200,000 KL ground-type LNG storage tanks are 9% Ni plate type tanks, and the project involves participation of 14 first-tier construction companies. It was a large-scale construction involving 12 tank units and auxiliary equipment construction, berthing facilities and unloading facilities at the same time. |
Original sector | Plant |
Budget |
Location
Country | South Korea |
Source
Source reliability | High |
Source | Hyundai Engineering |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, LNG, Natural Gas, Manufacturing (Industrial) |
Article published date | 2023-05-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
