Sampson Road Bridge Replace and Storm Water Impvmt
Sector: Water Supply and Storage • Location: Lees Summit, Missouri, United States of America
Source: Dodge USA
PROFESSIONAL ENGINEERING SERVICES FOR SAMPSON ROAD BRIDGE REPLACEMENT AND STORMWATER IMPROVEMENTS. Replace the existing bridge along Sampson Road the crosses over Mouse Creek. This bridge is a single lane, wood deck bridge on abutments installed over 100 years ago. These abutments restrict the channel causing stream degradation, erosion around the abutments, and damage to the steel girders caused
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Lees Summit, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sampson Road Bridge Replace and Storm Water Impvmt
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PROFESSIONAL ENGINEERING SERVICES FOR SAMPSON ROAD BRIDGE REPLACEMENT AND STORMWATER IMPROVEMENTS. Replace the existing bridge along Sampson Road the crosses over Mouse Creek. This bridge is a single lane, wood deck bridge on abutments installed over 100 years ago. These abutments restrict the channel causing stream degradation, erosion around the abutments, and damage to the steel girders caused by flooding. The channel degradation has created a large plume of silt deposits in Longview Lake ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Lees Summit |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
