San Andreas Pipeline #2
Sector: Steel • Location: San Franscisco, California, United States of America
Source: SF Water Power System
As part of regular maintenance and inspections of our major transmission lines, we identified sections of the San Andreas Pipeline Number 2 within the City of San Bruno that are almost 90-years-old and in need of rehabilitation. The project consisted of replacing about 6,500 ft. of the 54-inch diameter steel pipeline at four locations. These replacements have been completed.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | As part of regular maintenance and inspections of our major transmission lines, we identified sections of the San Andreas Pipeline Number 2 within the City of San Bruno that are almost 90-years-old and in need of rehabilitation. The project consisted of replacing about 6,500 ft. of the 54-inch diameter steel pipeline at four locations. These replacements have been completed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Steel projects in United States of America
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
- National Museum of African American History and Culture
- Walter E. Washington Convention Center
