San Antonio South Reliability Project Transmission Line
Sector: Government • Location: San Antonio, Texas, United States of America
Source: Dodge
The San Antonio South Reliability Project Transmission Line is proposed for alleviation of pressure on the Texas grid. The 345kV double circuit line will span 50 miles from the Howard Road substation to the San Miguel substation, with CPS handling the northern half and the South Texas Electric Cooperative managing the southern portion.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The San Antonio South Reliability Project Transmission Line is proposed for alleviation of pressure on the Texas grid. The 345kV double circuit line will span 50 miles from the Howard Road substation to the San Miguel substation, with CPS handling the northern half and the South Texas Electric Cooperative managing the southern portion. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
