San Clemente State Beach - Combination Building 6 Replace
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
Demolish existing combination building and construct a new 984 SF combination building to include six accessible unisex showers, three standard unisex restrooms, and three accessible restrooms. Scope includes removal of existing block retaining wall and cutting back a portion of landscape island to widen asphalt road pavement. Install new utility services for water sewer electric. Also includes ac
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Consumer Products
- Location
- San Clemente, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about San Clemente State Beach - Combination Building 6 Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolish existing combination building and construct a new 984 SF combination building to include six accessible unisex showers, three standard unisex restrooms, and three accessible restrooms. Scope includes removal of existing block retaining wall and cutting back a portion of landscape island to widen asphalt road pavement. Install new utility services for water sewer electric. Also includes accessible updates to existing site plan at SAN CLEMENTE STATE BEACH in Orange County, California. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Clemente |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Manufacturing (Industrial), Power Generation (CCGT), Commercial, Consumer Products |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
