San Diego International Airport Terminal 1 Replacement
The owner, status and timeline of this project. A free account opens every field.
Source: constructionreviewonline.com
San Diego International Airport is replacing the aging Terminal 1 with a new sustainable 19-gate facility, including expanded roadways, a large parking structure, and sustainability upgrades. The new terminal will have 30 gates in total, modern food and retail options, and a high-capacity baggage system.
- Status
- Under Construction
- Sector
- Airport, Car parking, Automotive
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- constructionreviewonline.com
ConstructChat
Ask ConstructChat about San Diego International Airport Terminal 1 Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | San Diego International Airport is replacing the aging Terminal 1 with a new sustainable 19-gate facility, including expanded roadways, a large parking structure, and sustainability upgrades. The new terminal will have 30 gates in total, modern food and retail options, and a high-capacity baggage system. |
Original sector | Transport |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | constructionreviewonline.com |
URL |
More Details
Record type | Project |
Sector | Airport, Car parking, Automotive |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in USA
- Corn-to-Methanol Biofuel Research Project
- Pathfinder 1 Zero-Emission Airship
- Oklahoma Aerospace Education Framework FY 2026
- Sarasota Bradenton International Airport Allegiant Terminal
- Warehouse Site Selection for HCRFT in New York City
- SAFFiRE Cellulosic Ethanol Pilot Plant
- Development of Large Displays for Eurofighter Typhoon
- PG&E, Nissan, and Fermata Energy V2X Microgrid Demonstration
