San Dieguito Double Track and Special Events Platform Project
Sector: Cement • Location: Del Mar, California, United States
Source: The Coast News Group
This $347 million project will replace the 109-year-old San Dieguito Railway River Bridge with a new concrete bridge above the floodplain, add 2.1 miles of double tracking between Solana Beach and Del Mar, and construct a special events platform at the Del Mar Fairgrounds. Construction is planned to begin in early 2027.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This $347 million project will replace the 109-year-old San Dieguito Railway River Bridge with a new concrete bridge above the floodplain, add 2.1 miles of double tracking between Solana Beach and Del Mar, and construct a special events platform at the Del Mar Fairgrounds. Construction is planned to begin in early 2027. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
