San Francisco Ferry Terminal W & E Berth Ramp Rehabilitation
Sector: Power Generation (CCGT) • Location: San Francisco, California, United States of America
Source: Dodge USA
This public works Project consists of, in general, rehabilitating the San Francisco Ferry Terminal existing west and east berth ramps. At the west berth, the work includes refurbishing the existing hydraulic systems including refurbishing the existing hydraulic cylinders, removing and replacing existing hydraulic lines, removing and replacing existing electrical and control systems, removing and r
- Status
- Closed
- Sector
- Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
- Location
- San Francisco, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about San Francisco Ferry Terminal W & E Berth Ramp Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This public works Project consists of, in general, rehabilitating the San Francisco Ferry Terminal existing west and east berth ramps. At the west berth, the work includes refurbishing the existing hydraulic systems including refurbishing the existing hydraulic cylinders, removing and replacing existing hydraulic lines, removing and replacing existing electrical and control systems, removing and replacing existing hydraulic equipmentsuch as pumps, valves, manifolds, and tanks, and testing and... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Francisco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
